Mistrzostwa Europy w Piłce Nożnej 2012 (Polish) Чемпіонат Європи з футболу 2012 (Ukrainian) |
|
---|---|
UEFA Euro 2012 official logo |
|
Tournament details | |
Host country | Poland Ukraine |
Dates | 8 June – 1 July |
Teams | 16 (from 1 confederation) |
Venue(s) | 8 (in 8 host cities) |
← 2008
2016 →
|
|
The 2012 UEFA European Football Championship, commonly referred to as Euro 2012, will be the 14th European Championship for national football teams sanctioned by UEFA. The final tournament will be hosted by Poland and Ukraine between 8 June and 1 July 2012.
The joint Poland/Ukraine bid was chosen by UEFA's Executive Committee on 18 April 2007, in Cardiff, Wales. This bid defeated the other shortlisted bids from Italy and Croatia/Hungary, becoming the third successful joint bid for the European Championship, after those of Belgium/Netherlands, for Euro 2000, and Austria/Switzerland for Euro 2008.
This will be the last European Championship finals in which only 16 nations will participate, with Euro 2016 being the first European Championship finals with 24 competing nations. Qualification for the final tournament will be staged between August 2010 and November 2011.
Contents |
The organisation of the event was initially contested by five bids representing seven countries: Croatia/Hungary (joint bid), Greece, Italy, Poland/Ukraine (joint bid), and Turkey.
On 8 November 2005, UEFA's Executive Committee whittled the candidates down to a short list of three:[1]
On 31 May 2006 all three bids completed the second phase of the process by submitting more detailed dossiers. In September 2006, UEFA conducted site visits to candidate countries. The hosts were chosen on 18 April 2007 in Cardiff, Wales. The results of the voting were:
Voting Results | |
---|---|
Country | Votes |
Poland / Ukraine | 8 |
Italy | 4 |
Croatia / Hungary | 0 |
The voting would have been made in a maximum of two rounds. For the vote to be valid, there had to be a quorum in the meeting room, i.e. at least eight Committee members, excluding the president and his deputy who did not have the right to vote. In the first round, each member had one vote. As the Poland/Ukraine bid received an absolute majority of 8 votes, it was announced the winner and the second round was not required.
The voting was conducted by the members of the UEFA Executive Committee composed of 14 members:
Carraro and Surkis were not entitled to vote in any of the ballots, as they represent candidate countries. (UEFA official voting rules) This left 12 votes available for the three competing bids.
Italy had already hosted the European Football Championship finals in 1968 and 1980, and also hosted the FIFA World Cup in 1934 and 1990. The Italian bid appeared to be the most solid of the three due to Italy's generally good transportation infrastructure, the wide availability of lodging for visiting fans, and the Italian football association's past experience in organising major tournaments. However, the 2006 Serie A scandal and the football-related violence in Catania, which led to the death of police officer Filippo Raciti and revealed safety deficiencies in many stadia, have damaged the overall standing of Italian football.
The following venues were proposed by the Italian Football Federation:
The following cities were proposed by the Hungarian Football Federation and the Croatian Football Federation:
Hungary was bidding for the third time consecutively after failing to win either the Euro 2004 or the Euro 2008 bid. It teamed up with Croatia after its previous partner, Austria, opted to associate with Switzerland to (successfully) bid to host Euro 2008.
Neither of the two countries had ever hosted similar major tournaments, although Croatia's capital Zagreb did host one semi-final and the third-place match of Euro 1976 when the country was part of the Socialist Federal Republic of Yugoslavia and Croatia has hosted the 1987 Summer Universiade, 1989 FIBA Men's European Basketball Championship, 2000 European Men's Handball Championship, 2003 World Women's Handball Championship, 2005 Women's European Volleyball Championship, 2008 European Figure Skating Championships, 2009 World Men's Handball Championship, FIS Alpine Ski World Cup Races, 2010 Adriatic Basketball League Final Four, IAAF Grand Prix Zagreb, 2010 IAAF Continental Cup and many others.
There is a possibility that Croatia will bid again, but in joint bid with Italy and Slovenia or with Bosnia and Herzegovina.
Apart from Donetsk and Kharkiv, the host cities are all popular tourist destinations. The bid plans the expansion and modernisation of roads and highways.[2] The obligatory improvement of the football infrastructure includes the building of the new Donbass Arena in Donetsk, which fits the 5-star UEFA criteria.
By June 2008, there were no plans to hold Euro 2012 outside Poland and Ukraine, according to UEFA.[3] However, Scotland has reportedly told UEFA it could step in and host the tournament.[3] In June 2008 Scottish FA chief executive Gordon Smith told BBC Sport: "We have made it clear that we'd like to be considered if it's not going ahead in Ukraine and Poland.... We haven't been told we are on standby or anything like that."[4] Platini has reiterated that "We will do everything possible so Poland and Ukraine can host Euro 2012. The only reason not to go ahead would be the absence of a stadium in Warsaw and Kiev". August 2009 Platini stated that Poland, unlike Ukraine, was almost prepared to host the tournament, while suggesting UEFA could cut number of Ukrainian cities hosting Euro 2012 he left the option for Poland to organise the tournament alone open.[5] By late August 2010 Platini and other UEFA officials were optimistic about preparations for the tournament in both countries and saw no major obstacles.[6][7]
On 30 January 2008, UEFA president Michel Platini went on the record to warn the organisers of the need to avoid "critical slippages" in their preparations.[4][8] Ukrainian Prime Minister Yulia Tymoshenko replied on 11 June 2008 that Ukraine's preparations for Euro 2012 were proceeding normally and that she was confident all projects would be completed on time.[9] However, an official from the Ukrainian football federation stated the next day that Ukraine could lose the right to co-host the event due to delays in the renovation of Kiev’s Olympic stadium.[10] UEFA has been monitoring the situation closely and Platini confirmed on 26 June that a decision would be made in September 2008.[11]
In late September 2008, the Polish government suspended the PZPN (the Polish FA) and assigned an administrator. UEFA issued a letter to the Polish FA. Warsaw was warned it risked losing the right to co-host Euro 2012 alongside Ukraine.[12] Scotland has reiterated their interest in holding the 2012 tournament, should it be stripped from Poland and Ukraine as a result of this situation.[13]
On 31 October 2008, Evhen Chervonenko, the chairman of Ukraine's organising committee, said that due to the ongoing economic crisis Ukraine is having difficulty building some of the infrastructure needed to host.[14] He said that the major projects such as airports and stadiums are on schedule, but a liquidity crunch has stalled the construction of approximately 80% of the hotels needed to host.[14]
In April 2009, UEFA president Michel Platini visited the host countries to evaluate their preparations. He re-affirmed that Ukraine will remain co-host but hinted that most matches could go to Poland.[15] Following his visit to Poland, Platini announced that Polish preparations were on track and he saw no major problems.[15] According to Platini, six to eight cities will be designated and "not necessarily in equal proportion between Poland and Ukraine."[16]
In May 2009 prior to the UEFA meeting in Bucharest, the Prime Minister of Poland Donald Tusk stated: "We would be ready to host Euro 2012 in not four but in five to six cities if need be, but I think we should stick to the four plus four formula and not undermine our partnership with Ukraine."[17] The President of the Polish FA, Grzegorz Lato also expressed support for the 4 + 4 solution: "Poles and Ukrainians are in favour of an equal solution. We are a team, and this is a team game."[18]
On 13 May 2009, UEFA confirmed the appointment of the Polish cities of Warsaw, Poznań, Wrocław and Gdańsk. While Kraków had received top marks from UEFA officials, it was not chosen as there was no justification to drop any of the original favorites whose preparations were all going well.[19]
A review of preparations in Ukraine revealed shortcomings in infrastructure in all candidate cities. A final deadline of 30 November 2009 was granted to Lviv, Donetsk and Kharkiv to meet specific conditions regarding infrastructure, with a warning that only Kiev and the best prepared city of the other candidates would otherwise be used.[20][21] Hryhoriy Surkis, the President of the Ukrainian FA argued that UEFA should grant his country more time before making a final decision on the host cities.[22] UEFA subsequently gave three Ukraine cities, Lviv, Donetsk and Kharkiv, until 30 November 2009 to prove they are capable of staging Euro 2012 games. Kiev was approved as a host city for most matches but the decision on whether it would host the final was deferred. "There are huge infrastructure problems to be resolved in Ukraine," UEFA president Michel Platini said.[23]
A July 2009 Ukrainian poll by research agency IFAK found that 56% of respondents believed that Ukraine will cope with hosting Euro 2012 and that 32% of respondents believed that their country will fail to stage Euro 2012 properly.[24]
In September 2009 Platini told reporters after an UEFA executive committee meeting "Ukraine has made sudden progress in their efforts to stage the tournament"[25]. In the same month, an airport building project to meet Euro 2012 requirements was presented in Donetsk.[26]
In December 2009, UEFA confirmed that the four Ukrainian cities (Donetsk, Kharkiv, Kiev and Lviv) will host EURO 2012 matches. Kiev was also confirmed to host the final game of Euro 2012. [27]
Concerns over Ukraine's preparations for the competition were raised again in May, after an interview between Michel Platini and the German Football Federation, suggesting that Germany and Hungary could replace them, unless improvements were made.[28] UEFA general secretary Gianni Infantino stated on August 12, 2010 "There is still a lot to do", but he had "full confidence and trust and I'm very optimistic on the success of the Euro 2012 in Ukraine".[6] On August 27, 2010 Platini seconded that and stated "You can consider that the ultimatum no longer exists".[7]
31 matches will be played during Euro 2012, with Ukraine hosting 16 matches and Poland 15[29]. The breakdown of hosting duties is as follows:
Warsaw | Poznań | Wrocław | Gdańsk |
---|---|---|---|
National Stadium Capacity: 55,920[30] |
Municipal Stadium Capacity: 45,830[31] |
Stadium in Maślice Capacity: 45,771[32] |
PGE Arena Gdańsk Capacity: 44,000[33] |
Kiev | Donetsk | Lviv | Kharkiv |
Olympic NSC Capacity: 69,004[34] |
Donbass Arena Capacity: 51,504[35] |
(No name adopted) Capacity: 33,500[36] |
Metalist Stadium Capacity: 41,411[37] |
The following venues were also considered but fell out of the running as a result of the UEFA meeting on 13 May 2009.[38]
City | Stadium | Capacity | Club | Host matches |
---|---|---|---|---|
Chorzów | Silesian Stadium | 55,211 | Poland (Górnik Zabrze, GKS Katowice, Ruch Chorzów, Polonia Bytom only in important matches) | not selected by UEFA |
Kraków | Wisła Stadium | 33,680 | Wisła Kraków | not selected by UEFA |
Odessa | Chornomorets Stadium | 34,362 | FC Chornomorets Odessa | not selected by UEFA |
Dnipropetrovsk | Dnipro Stadium | 31,003 | FC Dnipro Dnipropetrovsk | original plans stated it would host 3 group matches |
Euro 2012 is set to feature 16 national teams, as has been the format since 1996. Many European football associations were in favour of expanding the tournament to 24 teams due to the much-increased number of UEFA members in recent years (53 in April 2006 compared to 33 before the break up of the Soviet Union[39] and of Yugoslavia). However, on 17 April 2007, UEFA's Executive Committee formally decided against an expansion in 2012.[40] This will be the last time a European Championship will feature 16 teams, as in September 2008 UEFA announced its plans to expand to 24 teams in Euro 2016.[41]
The draw for the UEFA Euro 2012 qualifying round took place in Warsaw on 7 February 2010.[42] This was the first time the new UEFA national team coefficient was used for seeding the teams. The qualifying draw determined the makeup of nine groups. Nine groups were formed in the qualifying draw including six sections of six sides and three of five, as teams chase 14 finals places alongside co-hosts Poland and Ukraine. The seeding pots are formed on the basis of the UEFA national team coefficient ranking system, finalised after the completion of FIFA World Cup qualifying, with the reigning European champions automatically top seeded. All groups contained one nation from the first five pots and six sections also included a team from Pot 6.
Country | Qualified as | Date qualification was secured | Previous appearances in tournament |
---|---|---|---|
Poland | Co-hosts | 18 April 2007 | 12008) | (
Ukraine | Co-hosts | 18 April 2007 | 0 | (debut appearance)
The official logo for the competition was unveiled at a special event at Mykhailivska Square, Kiev, on 14 December 2009. It takes its visual identity from Wycinanki, the traditional art of paper cutting practised in Poland and rural areas of Ukraine. The art form symbolises the nature of the rural areas of Poland and Ukraine.[43] The logo features a flower for each of the host nations with a football in the centre, representing the emotion and passion of the European Championships; the stem of the flower symbolises UEFA and European football, the structural aspect of the competition. Other colours used in the logo – including woodland green, sun yellow, aqua blue, sky blue and blackberry purple – were also inspired by nature.[44] The logo unveiling ceremony was carried out by the presidents of the Polish and Ukrainian football associations, Grzegorz Lato and Hryhoriy Surkis, and UEFA president Michel Platini. Also in attendance were Ukraine's president and prime minister, Viktor Yushchenko and Yulia Tymoshenko.[45] As part of the event, landmark buildings in the eight host cities were illuminated with the tournament logo.[46] The competition slogan, "Creating History Together" (Polish: Razem tworzymy przyszłość, Ukrainian: Творимо історію разом / Tvorymo istoriyu razom), was announced along with the logo. The slogan reflects the fact that Poland and Ukraine represent the easternmost host nations in European Championship history.[43]
Tickets for UEFA EURO 2012 will be on sale from spring 2011. Individual match tickets will be offered as well as team series for each of the 16 participating sides. Furthermore there will be tickets reserved for football fans with a visual impairment or the need of a wheelchair requiring an accompanying person. It is already possible to register an e-mail address to be informed about the start of the ticket sales.[47]
|
|
|